Electronic State Business Daily Search
Sign in is NOT required.
For instructions on submitting bid responses, please review the posting entity’s solicitation and attached
bid documents.
Construction Materials Testing for North Austin Complex, Phase2 |
Solicitation ID: 303-3-03368
Status: Awarded
Contact Name: James Gonzalez
Contact Number: 512-936-0647
Contact Email: james.gonzalez@tfc.state.tx.us
Response Due Time: 3:00 PM
Agency/Texas SmartBuy Member Number: 303
Days Solicited: 21+ Days for Solicitation Notice
Solicitation Posting Date: 11/28/2022
Response Due Date: 12/21/2022
Last Modified: 3/17/2023 9:14 am
Solicitation Description:
DESCRIPTION 907-83 Testing Services 925-42 Foundation Engineering 925-44 General Construction: Management, Scheduling, Cost Estimation Engineering 925-55 Inspection, General Engineering 968-47 Inspection Services, Construction Type 992-34 Concrete Testing Services 992-36 Core Sample, not Concrete Testing Services 992-55 Miscellaneous Testing and Calibration Services 966-18 Copying Services (Reproduction) SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2254, Subchapter A, Professional Services, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting submittal of qualifications to provide prime professional Architectural/Engineering Services for the North Austin Complex Phase II, Project #20-027-8061, construction materials testing and special inspections for one new state office building, one multi-level parking structure, and extension of infrastructure and connection to the Central Utility Plant at the parking garage within the NAC Phase I in Austin, Texas. CONTRACT TERM: It is the intention of TFC to award a Contract for full prime professional architectural/engineering (A/E) services for the term of the project. Services undertaken pursuant to this RFQ will be required to commence within ten (10) calendar days of delivery of a Notice to Proceed. The Project associated with the services requested in this solicitation is anticipated to be Thirty (30) months. PROJECT DESCRIPTION: Provide construction materials observation and testing services for the proposed North Austin Complex, Phase II as described herein below: The 86th Legislature, in 2019, appropriated $161 Million for implementation of Phase Two of the plan to be comprised of an approximate 302,000 gross square foot building on the existing John H. Winters Campus in the vicinity of 51st street and Lamar Blvd. and a parking structure with approximately 2,000 parking spaces. More specifically, the “Project” is comprised of: 1) New State Office Building – approximate six (6) level office building, totaling 302,000 gross square feet (GSF) located along the west edge of the John H Winters campus. Structure to be south of 51st street in the vicinity of the intersection of W. Guadalupe and Lamar Blvd. 2) New Multi-level Parking structure – six (6) level above grade parking structure accommodating 1550 parking spaces. Approximate location to be on the east side of the John H Winters campus on the west side of Guadalupe Street, within the existing surface parking. 3) Connection to existing Central Utility Plant located in the garage of Phase I and expansion of plant equipment to accommodate Phase II. Approximate cost of construction for the aforementioned list of projects is estimated to be One hundred thirty-one million, one hundred thousand dollars ($131,100,000.00). The Pre-Proposal Tele-Conferences are scheduled for: PPC 1: December 6, 2022, 10:00 AM, PPC 2: December 7, 2022, 10:00 AM TFC is using the eProcurement system Bonfire. Respondents must register for a Bonfire account (No Charge) to submit a response. Respondents must submit their responses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/26282 EVENT DATE Issue RFQ 11/29/2022 Mandatory Pre-Submittal Conference 12/06/2022 Tuesday, 10:00 AM (OR) Mandatory Pre-Submittal Conference 12/07/2022 Wednesday, 10:00 AM Deadline for Submission of Questions 12/13/2022 Deadline for Submission of Qualifications & HSP 12/21/2022 Wednesday @ 3:00 PM Notification to Interview 1/04/2023 If Interviews are NOT required by TFC Award by Commission 2/16/2023 Execute Contract 3/16/2023 If Interviews are required by TFC Interviews of short listed firms 1/12/2023 Award by Commission 2/16/2023 Execute Contract 3/16/2023
Class/Item Code(s):
90783-Testing Services
92542-Foundation Engineering
92544-General Construction: Management, Scheduling, Cost Estimation - Engineering
92555-Inspecting, General/Engineering
96847-Inspection Services, Construction Type
99234-Concrete Testing Services
99236-Core Sample (Not Concrete) Testing Services
99255-Miscellaneous Testing And Calibration Services
Attachments
Contractor Name | Mailing Address | Value Per Contractor | Contractor Hub Status | Award Date | Award Status |
---|---|---|---|---|---|
Raba Kistner | 8100 Cameron Rd., Suite B-150, Austin, TX 78754 | 788274.70 | NOT HUB CERTIFIED | 3/17/2023 | Full Award |