Construction Manager-At-Risk for Capitol Complex, Phase 2 Project

Solicitation ID: 303-1-02324

Status: Awarded

Contact Name: james.gonzalez@tfc.state.tx.us

Contact Number: 512-936-0647

Contact Email: james.gonzalez@tfc.state.tx.us

Response Due Time: 3:00 PM

Agency/Texas SmartBuy Member Number: 303

Days Solicited: 21+ Days for Solicitation Notice

Solicitation Posting Date: 8/31/2021

Response Due Date: 10/5/2021

Last Modified: 1/24/2022 11:53 am

Solicitation Description:

SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to provide pre-construction, communications management, construction management, closeout, and warranty phase services for the Capitol Complex Phase Two Project, hereinafter described as TFC Project #20-028-8011 (the Project). This Project will be administered by TFC.  This Project to include two (2) new state office buildings, associated parking structures, and extension of pedestrian mall (“Capitol Mall”) with the Capitol Complex in Austin, Texas as described further in the project description below

COST OF WORK: Respondents to the RFQ should consider the “Cost of Work” as two hundred twenty-four million, five hundred forty-three thousand dollars ($224,543,000.00), not including any Pre-Construction Management fees, Construction Management fees, and Construction General Conditions, as part of the construction budget or the Guaranteed Maximum Price (GMP).

CONTRACT TERM: Construction is required to commence within ten (10) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be eighteen (18) months.  The construction contract period is projected for a term of thirty (30) months except as may be otherwise amended or negotiated.

PROJECT DESCRIPTION: The project includes all aspects of planning, development, architecture, engineering, design, procurement, demolition, renovation, and construction of facilities and improvements for Phase Two of the Capitol Complex project, described specifically as follows:

·         New State Office Building – approximately ten (10) level office building, totaling 360,000 gsf located at 15th Street, between Lavaca Street and Colorado Street with underground and above grade parking accommodating 1,650 parking spaces;

·         New State Office Building – approximately five (5) level office building, totaling 165,000 gsf located at 15th Street, between Colorado Street and Congress Avenue with underground and above grade parking accommodating 900 parking spaces;

·         Complete extension of the pedestrian mall, (Capitol Mall), located at Congress Avenue, between 15th Street and 16th Street; and

·         All associated infrastructure to serve the buildings, structures, and improvements in Phase Two.

·         The following properties can be described more specifically as follows:

o   State of Texas Parking Lot #8 and Capitol Complex Childcare Facility building grounds:  One full block bounded by Lavaca Street, 16th Street, Colorado Street, and 15th Street; and

o   State of Texas Parking Lot #11 and Capitol District Office (DPS) building grounds:  One half block bounded by Colorado Street, Texas Historical Commission facilities, Congress Avenue, and 15th Street; and Congress Avenue extending from 15th Street to 16th Street.

MANDATORY PRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will be held on Tuesday, September 14, 2021 at 10:000 AM and Wednesday, September 15, 2021 a 10:00 AM.   Pre-registration is required to participate in the teleconference.  Respondents must have an employee of their firm attend at least one (1) of the two (2) pre-submittal conferences

 

 TFC is using the eProcurement system Bonfire.  Respondents must register for a Bonfire account (No Charge) to submit a response.  Respondents must submit their responses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/50850 

 

 

EVENT

DATE

Issue RFQ

8/31/2021

Mandatory Pre-Submittal Teleconferences

1st PSC

 

2nd PSC

 

 9/14/2021, 10:00 AM, Central Time (CT)

 9/15/2021, 10:00 AM, CT

Deadline for Submission of Questions

9/21/2021

Deadline for TFC to respond to submitted questions

9/28/2021

Deadline for Submission of Qualifications and HSP

10/05/2021, 3:00 PM, CT

Notification of Short List Selection

10/22/2021

 

 

Deadline for Submission of Proposals

10/28/2021, 3:00 PM, CT

Notification of Interview Selection

11/04/2021

Interviews

11/17/2021

Award by Commission

12/16/2021, 9:00 AM

Execute Contract

1/18/2022

 



Class/Item Code(s): 90922-Building Construction, Non-Residential (Office Bldg., Etc.)
90924-Building Construction, Commercial And Institutional
90930-Building Construction (Not Otherwise Classified)
91400-Construction Services, Trade (New Construction)
91200-Construction Services, General (Incl. Maintenance And Repair Services)


Contractor Name Mailing Address Value Per Contractor Contractor Hub Status Award Date Award Status
JE Dunn Construction Company 1601 S MoPac Expressway, Barton Skyway Two, Suite 450, Austin, TX 78746 51,052,467.00 NOT HUB CERTIFIED 1/24/2022 Full Award